Update on Restoration of the Spire

The next big visible change will be the installation of a special hoist for transporting new block work up the spire.  The weathervane was due to be removed for refurbishing but when this was attempted, what was believed to be a 2 metre shaft is over 5 metres long and so it cannot be removed without extensive further works and removal of a large section of the spire.  Therefore it was decided instead to give the weathervane an in-situ clean, rub down, refurbish and polish.

Next Major Milestones:

  • Raking out of mortar – inside to start with
  • Weathervane to be renovated and polished
  • Re-pointing and installation of blockwork
  • Agree start date for clock refurbishment
  • Pay another instalment of the bill.